Question 1
Describe four duties of the
controlling contractor on a steel erection site.
Your response should be at least 75 words in length.
Question 2
What is a controlled decking zone (CDZ)? What are the requirements for
working in a CDZ?
Your response should be at least 75 words in length.
Question 3
Discuss some ways that employee exposure to overhead loads during steel
erection can be reduced. When is working under a load permitted?
Your response should be at least 75 words in length.
Question 4
Explain the difference in fall protection requirements for connectors
working in steel erection between 15 feet and 30 feet in height and connectors
working more than two stories or 30 feet in height.
Your response should be at least 75 words in length.
Field of study: